26,99 €
inkl. MwSt.
Versandkostenfrei*
Versandfertig in 6-10 Tagen
payback
13 °P sammeln
  • Broschiertes Buch

Bridge construction by segmental launching technique is one of the most popular technique in urban areas due to faster construction, less traffic disturbance and higher quality control. But This techniques requires higher number of skilled workers of the different fields. In this book, all major site works of segmental bridge construction are briefly discussed with proper procedure and resource required through the case study of construction of Elevated corridor from Prembari Pul to Azadnagar, Delhi.

Produktbeschreibung
Bridge construction by segmental launching technique is one of the most popular technique in urban areas due to faster construction, less traffic disturbance and higher quality control. But This techniques requires higher number of skilled workers of the different fields. In this book, all major site works of segmental bridge construction are briefly discussed with proper procedure and resource required through the case study of construction of Elevated corridor from Prembari Pul to Azadnagar, Delhi.
Autorenporträt
Abhishek Kumar é um autor técnico emergente. As suas principais áreas de investigação incluem a IoT, a aprendizagem automática e a computação em nuvem. Recebeu o prémio "Technical Genius Award" da Associação de Engenheiros e Técnicos Informáticos. Como investigador associado de um projeto financiado pelo DRDO, co-inventou o KGSAN (uma estrutura IoT premiada pelo Yahoo R&D).