61,95 €
61,95 €
inkl. MwSt.
Sofort per Download lieferbar
payback
31 °P sammeln
61,95 €
61,95 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
31 °P sammeln
Als Download kaufen
61,95 €
inkl. MwSt.
Sofort per Download lieferbar
payback
31 °P sammeln
Jetzt verschenken
61,95 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
31 °P sammeln
  • Format: ePub

The introduction of new 500 MW and 660 MW turbine generator plant in nuclear,
coal- and oil-fired power stations has been partly responsible for the increase
in generating capacity of the CEGB over the last 30 years. This volume provides
a detailed account of experience gained in the development, design, manufacture,
operation and testing of large turbine-generators in the last 20 years. With the advance in analytical and computational techniques, the application of this experience to future design and operation of large turbine-generator plant will be of great value to engineers in the industry.
…mehr

  • Geräte: eReader
  • mit Kopierschutz
  • eBook Hilfe
  • Größe: 29.3MB
Produktbeschreibung
The introduction of new 500 MW and 660 MW turbine generator plant in nuclear,
coal- and oil-fired power stations has been partly responsible for the increase
in generating capacity of the CEGB over the last 30 years. This volume provides
a detailed account of experience gained in the development, design, manufacture,
operation and testing of large turbine-generators in the last 20 years. With the advance in analytical and computational techniques, the application of this experience to future design and operation of large turbine-generator plant will be of great value to engineers in the industry.

Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.