13,99 €
13,99 €
inkl. MwSt.
Sofort per Download lieferbar
payback
0 °P sammeln
13,99 €
13,99 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
Als Download kaufen
13,99 €
inkl. MwSt.
Sofort per Download lieferbar
payback
0 °P sammeln
Jetzt verschenken
13,99 €
inkl. MwSt.
Sofort per Download lieferbar

Alle Infos zum eBook verschenken
payback
0 °P sammeln
  • Format: ePub

In order to cut costs during the economic downturn, many businesses are implementing abstinence policies. This could mean laying off workers and cutting some wages. In fact, those actions might only work for a short time.Unless the company implements a culture of continuous improvement and alters its method of operation, the situation may recur and become even worse. This brings us back to the purpose for which the Toyota production system was developed. Waste is anything that uses resources but offers the customer nothing in return. Most activities are waste, or "muda," and can be divided…mehr

  • Geräte: eReader
  • ohne Kopierschutz
  • eBook Hilfe
  • Größe: 0.75MB
  • FamilySharing(5)
Produktbeschreibung
In order to cut costs during the economic downturn, many businesses are implementing abstinence policies. This could mean laying off workers and cutting some wages. In fact, those actions might only work for a short time.Unless the company implements a culture of continuous improvement and alters its method of operation, the situation may recur and become even worse. This brings us back to the purpose for which the Toyota production system was developed. Waste is anything that uses resources but offers the customer nothing in return. Most activities are waste, or "muda," and can be divided into two categories. Although type one muda does not provide value, it is inescapable given the production assets and technologies available today. An illustration would be checking welds for safety, that type we also call necessary non value-added activity. Type two muda does not add value and can be quickly eliminated. An illustration is a process in a process village with disconnected phases that may be swiftly converted into a cell where unnecessary material moves and inventory are no longer necessary. A very small portion of all value-stream activities truly generate value as perceived by the client. The most effective way to boost business performance is to stop doing the numerous unnecessary things.

Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.