Soosaiya Anthreas
Project Execution of Mega-Projects for the Oil and Gas Industries
Soosaiya Anthreas
Project Execution of Mega-Projects for the Oil and Gas Industries
- Broschiertes Buch
- Merkliste
- Auf die Merkliste
- Bewerten Bewerten
- Teilen
- Produkt teilen
- Produkterinnerung
- Produkterinnerung
This book covers execution of mega industrial projects in oil/gas industries covering engineering, procurement, construction, commissioning and performance testing and covers various tasks under each discipline to define the detailed scope of work, supplies and services.
Andere Kunden interessierten sich auch für
- Soosaiya AnthreasProject Execution of Mega-Projects for the Oil and Gas Industries103,99 €
- Davies A. IgberaeseIntroduction to Project Management40,99 €
- Virendra Kumar Paul (School of Planning and New Delhi ArchitectureEstablishing a Performance Index for Construction Project Managers70,99 €
- Vijay BansalProject Management69,99 €
- Marcio Wagner da SilvaCrude Oil Refining111,99 €
- Martin BaumersPractical Management for the Digital Age101,99 €
- Abdul Razzak RumaneQuality Auditing in Construction Projects56,99 €
-
-
-
This book covers execution of mega industrial projects in oil/gas industries covering engineering, procurement, construction, commissioning and performance testing and covers various tasks under each discipline to define the detailed scope of work, supplies and services.
Produktdetails
- Produktdetails
- Verlag: Taylor & Francis Ltd
- Seitenzahl: 208
- Erscheinungstermin: 25. September 2023
- Englisch
- Abmessung: 156mm x 235mm x 14mm
- Gewicht: 326g
- ISBN-13: 9780367675264
- ISBN-10: 0367675269
- Artikelnr.: 68716040
- Verlag: Taylor & Francis Ltd
- Seitenzahl: 208
- Erscheinungstermin: 25. September 2023
- Englisch
- Abmessung: 156mm x 235mm x 14mm
- Gewicht: 326g
- ISBN-13: 9780367675264
- ISBN-10: 0367675269
- Artikelnr.: 68716040
Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and
Administration. 2. HSE, Social and Security. 3. Services and Facilities to
Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic
and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning,
Start-up and Performance Test. 10. Temporary Facilities. SECTION II
COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12.
Extension of Time. 13. Professionally Handling Large Claims. 14.
Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays.
16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency
Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws
and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25.
Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29.
Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract
Price below Floor Price and Consequences. 32. Owner's Delay on Document
Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle
Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells
(Owner Delays). 36. Strategy for using Non-Spec Feedstock for
Commissioning. 37. Gas In and Authority Check points. 38. Value
Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT
(Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak
Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF
ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2.
Contract Price Weight Factor. 3. Monthly Status Report Contents. 4.
Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block
Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter.
9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of
Procedures and Plans. 11. Total Plant Break down into Areas.
Administration. 2. HSE, Social and Security. 3. Services and Facilities to
Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic
and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning,
Start-up and Performance Test. 10. Temporary Facilities. SECTION II
COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12.
Extension of Time. 13. Professionally Handling Large Claims. 14.
Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays.
16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency
Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws
and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25.
Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29.
Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract
Price below Floor Price and Consequences. 32. Owner's Delay on Document
Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle
Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells
(Owner Delays). 36. Strategy for using Non-Spec Feedstock for
Commissioning. 37. Gas In and Authority Check points. 38. Value
Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT
(Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak
Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF
ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2.
Contract Price Weight Factor. 3. Monthly Status Report Contents. 4.
Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block
Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter.
9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of
Procedures and Plans. 11. Total Plant Break down into Areas.
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and
Administration. 2. HSE, Social and Security. 3. Services and Facilities to
Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic
and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning,
Start-up and Performance Test. 10. Temporary Facilities. SECTION II
COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12.
Extension of Time. 13. Professionally Handling Large Claims. 14.
Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays.
16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency
Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws
and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25.
Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29.
Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract
Price below Floor Price and Consequences. 32. Owner's Delay on Document
Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle
Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells
(Owner Delays). 36. Strategy for using Non-Spec Feedstock for
Commissioning. 37. Gas In and Authority Check points. 38. Value
Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT
(Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak
Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF
ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2.
Contract Price Weight Factor. 3. Monthly Status Report Contents. 4.
Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block
Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter.
9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of
Procedures and Plans. 11. Total Plant Break down into Areas.
Administration. 2. HSE, Social and Security. 3. Services and Facilities to
Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic
and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning,
Start-up and Performance Test. 10. Temporary Facilities. SECTION II
COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12.
Extension of Time. 13. Professionally Handling Large Claims. 14.
Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays.
16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency
Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws
and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25.
Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29.
Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract
Price below Floor Price and Consequences. 32. Owner's Delay on Document
Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle
Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells
(Owner Delays). 36. Strategy for using Non-Spec Feedstock for
Commissioning. 37. Gas In and Authority Check points. 38. Value
Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT
(Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak
Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF
ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2.
Contract Price Weight Factor. 3. Monthly Status Report Contents. 4.
Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block
Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter.
9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of
Procedures and Plans. 11. Total Plant Break down into Areas.