23,99 €
inkl. MwSt.

Versandfertig in 6-10 Tagen
payback
12 °P sammeln
  • Broschiertes Buch

This book contains the tools which can be used to optimise the effective use of resources.When we consider productivity, the problem is how to schedule the resource to obtain expected productivity- which can be solved by this model by planning for high productivity with the available resource at budgeted cost. The model is mainly intended to obtain information from the project, combine with PERT to find the optimum duration of the project.

Produktbeschreibung
This book contains the tools which can be used to optimise the effective use of resources.When we consider productivity, the problem is how to schedule the resource to obtain expected productivity- which can be solved by this model by planning for high productivity with the available resource at budgeted cost. The model is mainly intended to obtain information from the project, combine with PERT to find the optimum duration of the project.
Autorenporträt
Mme S. Premalatha est titulaire d'un diplôme d'études supérieures en ingénierie et gestion de la construction de l'Université Anna et a obtenu son diplôme de premier cycle de GCT, Coimbatore. Elle a travaillé dans des industries et des institutions d'ingénierie à Coimbatore et a publié des articles dans plusieurs journaux et conférences. Elle a participé à plusieurs ateliers, séminaires..,