25,99 €
inkl. MwSt.
Versandkostenfrei*
Versandfertig in über 4 Wochen
payback
13 °P sammeln
  • Gebundenes Buch

The Messina Strait Bridge, connecting Sicily to mainland Italy, was to be opened by 2018. But, in 2013, after decades of designing, testing, and approving what could have been the greatest construction project of the 21st century, the project was cancelled. Why?

Produktbeschreibung
The Messina Strait Bridge, connecting Sicily to mainland Italy, was to be opened by 2018. But, in 2013, after decades of designing, testing, and approving what could have been the greatest construction project of the 21st century, the project was cancelled. Why?