The Modernisation of the Belle Ombre Train Station in Pretoria, South Africa
-
- Taschenbuch
- eBook ausgewählt
-
Form:Einzelkauf Download
-
Sprache:Englisch
18,99 €
inkl. gesetzl. MwSt.Beschreibung
Produktdetails
Format
Kopierschutz
Nein
Family Sharing
Nein
Text-to-Speech
Nein
Erscheinungsdatum
13.02.2018
Verlag
GRINSeitenzahl
51 (Printausgabe)
Dateigröße
2103 KB
Auflage
1. Auflage
Sprache
Englisch
EAN
9783668635906
The project report framework model used is based on New Engineering Contract (NEC) categorisation of contract by the Institution of Civil Engineers (1993) provisions for a Separate Design and Construction Contract (SDCC) focussing per Smith, N.J. (2002)., on three project pillars of Cost, Quality and Time allocation to the project together with the associated risks and risk mitigation methods. The agreed initial period was two and one half years commencing in July 2012. An inclusive (turn-key) Train station modernisation Capital fund allocation and contract budget was £23 million. The high level estimated final cost was in the region of £22 million. The proportion allocation for the mechanical and electrical portions stated above was to be below 30% of the total estimated final cost. This case study seeks to provide a balance between a selected executed project and how the approaches to project management activities set out in the class module structure for this study is contrasted with the approaches negotiated in execution of this selected project.
Noch keine Bewertungen vorhanden
Verfassen Sie die erste Bewertung zu diesem Artikel
Helfen Sie anderen Kundinnen und Kunden durch Ihre Meinung.
Kurze Frage zu unserer Seite
Vielen Dank für dein Feedback
Wir nutzen dein Feedback, um unsere Produktseiten zu verbessern. Bitte habe Verständnis, dass wir dir keine Rückmeldung geben können. Falls du Kontakt mit uns aufnehmen möchtest, kannst du dich aber gerne an unseren Kund*innenservice wenden.
zum Kundenservice