Suman Budhathoki
eBook, ePUB

Grid Connection of Gotikhel Micro Hydropower Plant without Interrupting Isolated Load (eBook, ePUB)

Versandkostenfrei!
Sofort per Download lieferbar
Statt: 47,95 €**
36,99 €

inkl. MwSt. und vom Verlag festgesetzt.
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Alle Infos zum eBook verschenken
Weitere Ausgaben:
PAYBACK Punkte
0 °P sammeln!
**Preis der gedruckten Ausgabe (Broschiertes Buch)
Master's Thesis from the year 2011 in the subject Electrotechnology, grade: 1.7, Brandenburg Technical University Cottbus, course: Electric Power Engineering - Micro Hydro-power and its grid connection, language: English, abstract: 1. Introduction Gotikhel Hydropower Plant (GHP) is one of the nearest Isolated Micro Hydropower Plant (MHP) from the main city out of 650 isolated MHPs available in Nepal which still supplies electrical power to 173 Households, one hull machine and one school. The extension of national grid has made life of MHPs insecure as consumers want the energy from more reliab...

Dieser Download kann aus rechtlichen Gründen nur mit Rechnungsadresse in A, B, BG, CY, CZ, D, DK, EW, E, FIN, F, GR, HR, H, IRL, I, LT, L, LR, M, NL, PL, P, R, S, SLO, SK ausgeliefert werden.