SIMULATION OF HYDROPOWER ENERGY GENERATION

SIMULATION OF HYDROPOWER ENERGY GENERATION

Case Study for the Development and Optimization of Lower Spat Gah (Ls) Scheme

Versandkostenfrei!
Versandfertig in 6-10 Tagen
32,99 €
inkl. MwSt.
PAYBACK Punkte
16 °P sammeln!
Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main...