Practices for Seamless Transmission of Design Data from Design Phase to Construction Equipment Operation

Practices for Seamless Transmission of Design Data from Design Phase to Construction Equipment Operation

A Synthesis Study

Versandkostenfrei!
Versandfertig in über 4 Wochen
12,99 €
inkl. MwSt.
PAYBACK Punkte
6 °P sammeln!
The Indiana Department of Transportation (INDOT), in response to requests from the construction contracting community, has chosen to examine how to facilitate their contractors' use of three-dimensional machine control (3D-MC) systems, especially GPS-based systems. INDOT recognizes that the prerequisite 3D project model, if available in its intelligent electronic form, may be leveraged by both INDOT and its project partners to automate the performance of tasks other than construction. Therefore, INDOT was compelled to initiate this study to investigate the state of technology and the experienc...