Power Transfer Bottlenecks Determination for the Eastern Grid

Power Transfer Bottlenecks Determination for the Eastern Grid

Bangladesh Power System

Versandkostenfrei!
Versandfertig in 6-10 Tagen
26,99 €
inkl. MwSt.
PAYBACK Punkte
13 °P sammeln!
The emerging trend of deregulating power industries requires the operator to keep the transmission network congestion free when the generation companies compete to sell electricity to the distributors or wholesale purchasers. This requires the determination of various power transfer bottlenecks in the existing network. For this purpose the real-time predetermination of an index termed "Available Transfer Capability (ATC)" is required. Transfer capability of a power system also indicates how much inter area power transfer can be increased without system security violations. In case of large pow...