Monitoring of Vegetation and Soil Erosion Prediction along Pipelines

Monitoring of Vegetation and Soil Erosion Prediction along Pipelines

Versandfertig in 6-10 Tagen
29,99 €
inkl. MwSt.
PAYBACK Punkte
15 °P sammeln!
The construction of Baku-Tbilisi-Ceyhan (BTC) Oil and South Caucasus Gas (SCP) pipelines was completed in 2005. The Azerbaijan section of BTC Oil and SCP Gas pipelines is 442 km long and 44 m wide corridor named as the Right-of-Way. BTC and SCP pipelines are aligned parallel to each other within the same 44m corridor. The construction process of the pipelines significantly disturbed vegetation and soil cover along Right-of-Way of pipelines. The revegetation and erosion control measures were conducted after the completion of construction to restore the disturbed footprints of construction activ...