Lessons Learned From Early Implementation of The Maintenance Rule at Nine Nuclear Power Plants
Gebundenes Buch

Lessons Learned From Early Implementation of The Maintenance Rule at Nine Nuclear Power Plants

Versandkostenfrei!
Versandfertig in über 4 Wochen
26,99 €
inkl. MwSt.
PAYBACK Punkte
13 °P sammeln!
This report summarizes the lessons learned from the nine pilot site visits that were performed to review early implementation of the maintenance rule using the draft NRC Maintenance Inspection Procedure. Licensees followed NUMARC 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." In general, the licensees were thorough in determining which structures, systems, and components (SSCs) were within the scope of the maintenance rule at each site. The use of an expert panel was an appropriate and practical method of determining which SSCs are risk sig...