HYDROPOWER DEVELOPMENT-A CASE STUDY IN PAKISTAN

HYDROPOWER DEVELOPMENT-A CASE STUDY IN PAKISTAN

Analyzing Interaction of Head in Reducing Power and Energy during Low Flows

Versandkostenfrei!
Versandfertig in 6-10 Tagen
32,99 €
inkl. MwSt.
PAYBACK Punkte
16 °P sammeln!
Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Ghazi-Barotha is a runoff river hydropower project located at downstream of Tarbela and on left bank of Indus River. The project was studied to feasibility level in 1990, implementation was started in 1995 and now in operation since 2003. The project is being operated with full capacity during peak hours but be influenced by Kalabagh reservoir during August to March. The reduction in head to some extent red...