Design of a 20,000 H.P. Hydroelectric Development on the Genesee River at Portage, N.Y
Louis Goldberg
Gebundenes Buch

Design of a 20,000 H.P. Hydroelectric Development on the Genesee River at Portage, N.Y

Versandkostenfrei!
Versandfertig in über 4 Wochen
29,99 €
inkl. MwSt.
Weitere Ausgaben:
PAYBACK Punkte
15 °P sammeln!
A detailed engineering study from 1916, "Design of a 20,000 H.P. Hydroelectric Development on the Genesee River at Portage, N.Y" presents a comprehensive plan for harnessing the power of the Genesee River. Authored by Louis I. Goldberg, this work offers insights into the design and construction considerations for a large-scale hydroelectric plant in the early 20th century. The book delves into aspects of civil and hydraulic engineering relevant to the project, including dam construction, water flow management, and power generation. It would be of interest to historians of technology, civil eng...