Design and Analysis of Hybrid Power Generation System in South Asia

Design and Analysis of Hybrid Power Generation System in South Asia

Versandkostenfrei!
Versandfertig in 6-10 Tagen
36,99 €
inkl. MwSt.
PAYBACK Punkte
18 °P sammeln!
In spite of long war (almost four decades) and security issues in Afghanistan, there are environmental and electricity shortage issues. The war and climate changes caused the drought, air and water pollution, deforestation, soil degradation, overgrazing, desertification, and over population in urban areas, for instance, Kabul city; the pollution always cover the city especially in winter when the wood and coal-fired space heaters provide the houses heating increase the pollution. Before the civil war, there was electric bus system in the Kabul city. The electricity grid is limited to the citie...