Contract Time Optimization Methodologies for Highway Construction Projects
Yi JiangHuaxin Chen
Broschiertes Buch

Contract Time Optimization Methodologies for Highway Construction Projects

Versandkostenfrei!
Versandfertig in über 4 Wochen
17,99 €
inkl. MwSt.
PAYBACK Punkte
9 °P sammeln!
This study was conducted to develop methodologies for appropriately determining the monetary values of I/D rates of highway construction projects in Indiana. In this study, a comprehensive literature review was performed to identify possible effective methodologies for work zone effects, construction impacts, and contract time optimization. The highway production rates were developed in a previous study. The production rates were validated and adjusted with the help from INDOT field engineers. The weigh-in-motion (WIM) collected traffic data were obtained, processed, and analyzed to provide in...