Analysing the sustainability of a transmission line project

Analysing the sustainability of a transmission line project

The case of the 500 kV Tucuruí-Manaus line

Versandkostenfrei!
Versandfertig in 6-10 Tagen
36,99 €
inkl. MwSt.
PAYBACK Punkte
18 °P sammeln!
Analysing the future need for electricity demanded by economic agents and society in general is one of the priority technical activities in the planning of the Brazilian electricity sector. Defining the route of transmission lines is an integral part of this planning, in which the impacts associated with the construction and operation of these projects must be recognised, seeking to minimise the negative aspects and mitigate their effects on the population and the environment in general. Sustainability assessment can be seen as a multi-criteria problem, which must include technical, economic, ...