A Ten Thousand Horse-Power Hydro-Electric Installation at Olmsted, Utah, With Special Reference to High-Tension Wiring and High-Tension Outlets
Alvin Meyers
Broschiertes Buch

A Ten Thousand Horse-Power Hydro-Electric Installation at Olmsted, Utah, With Special Reference to High-Tension Wiring and High-Tension Outlets

Versandkostenfrei!
Versandfertig in über 4 Wochen
17,99 €
inkl. MwSt.
Weitere Ausgaben:
PAYBACK Punkte
9 °P sammeln!
This technical report describes the construction of a large-scale hydroelectric power plant in Olmsted, Utah. Written by Alvin Meyers, a leading engineer in the field of electrical power, the report provides detailed information on the design, construction, and operation of the plant, including its high-tension wiring and outlets. Essential reading for anyone involved in the field of electrical engineering. This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work is in the "public domain in the United Stat...